This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Last revision Both sides next revision | ||
mbse:incose_mbse_iw_2017 [2017/01/31 17:00] htummescheit added pdf for "Closing the design cycle loop" |
mbse:incose_mbse_iw_2017 [2017/02/20 12:06] rburkhart [Tuesday, January 31, 2017] |
||
---|---|---|---|
Line 50: | Line 50: | ||
^Time^Agenda Item/Presentation Link^Presenter^ | ^Time^Agenda Item/Presentation Link^Presenter^ | ||
| 10:30-11:00 | {{:mbse:incose_mbse_iw_2017:mbse_accelerate_transformation_kickoff_2017.pdf|MBSE Initiative}} | Mark Sampson (Siemens) | | | 10:30-11:00 | {{:mbse:incose_mbse_iw_2017:mbse_accelerate_transformation_kickoff_2017.pdf|MBSE Initiative}} | Mark Sampson (Siemens) | | ||
- | | 11:00-12:00 | Robust Design and Process Effectiveness through Model-Based Methods | Casey Medina & Kristina Fuerst (Terumo Medical) | | + | | 11:00-12:00 | {{:mbse:incose_mbse_iw_2017:1100_iw_2017_terumo_mbse_plenary.pdf|Robust Design and Process Effectiveness through Model-Based Methods}} | Casey Medina & Kristina Fuerst (Terumo Medical) | |
| 13:00-13:30 | {{:mbse:incose_mbse_iw_2017:1300_peterson_iw2017_transformation_v6.pdf|Systems Engineering Transformation Strategic Objective}} | Troy Peterson (SSI) | | | 13:00-13:30 | {{:mbse:incose_mbse_iw_2017:1300_peterson_iw2017_transformation_v6.pdf|Systems Engineering Transformation Strategic Objective}} | Troy Peterson (SSI) | | ||
| 13:30-14:15 | {{:mbse:incose_mbse_iw_2017:digital_engineering_in_complex_systems_incose_baldwin.pptx|Invited Speaker: Digital Engineering}} | Kristen Baldwin (U.S. DoD DASD(SE)) | | | 13:30-14:15 | {{:mbse:incose_mbse_iw_2017:digital_engineering_in_complex_systems_incose_baldwin.pptx|Invited Speaker: Digital Engineering}} | Kristen Baldwin (U.S. DoD DASD(SE)) | | ||
Line 67: | Line 67: | ||
| 9:00-9:30 | MBSE Initiative & SE Transformation | Mark Sampson (Siemens) & Troy Peterson (SSI) | | | 9:00-9:30 | MBSE Initiative & SE Transformation | Mark Sampson (Siemens) & Troy Peterson (SSI) | | ||
| 9:30-10:00 | {{:mbse:procter_modelon_trc_incose_iw_2017.pdf|Closing the Design Cycle Loop with Executable Requirements and OSLC}} | B. Sherman (Procter & Gamble) & H. Tummescheit (Modelon) & J. Llorens (The Reuse Co.) | | | 9:30-10:00 | {{:mbse:procter_modelon_trc_incose_iw_2017.pdf|Closing the Design Cycle Loop with Executable Requirements and OSLC}} | B. Sherman (Procter & Gamble) & H. Tummescheit (Modelon) & J. Llorens (The Reuse Co.) | | ||
- | | 10:30-11:00 | JPL Model-Based Systems Engineering Case Study | Chris Delp (NASA JPL) | | + | | 10:30-11:00 | {{:mbse:incose_mbse_iw_2017:iw_2017_open_mbee.pdf|JPL Model-Based Systems Engineering Case Study}} | Chris Delp (NASA JPL) | |
| 11:00-11:30 | {{:mbse:incose_mbse_iw_2017:iw2017_mbse_pathfinder_overview_charts_2017-01-29.pptx|NASA Model-Based Systems Engineering Pathfinder 2016 Summary and Path Forward}} | K. Weiland & J. Holladay (NASA) | | | 11:00-11:30 | {{:mbse:incose_mbse_iw_2017:iw2017_mbse_pathfinder_overview_charts_2017-01-29.pptx|NASA Model-Based Systems Engineering Pathfinder 2016 Summary and Path Forward}} | K. Weiland & J. Holladay (NASA) | | ||
| 11:30-12:00 | {{:mbse:incose_mbse_iw_2017:1130_iw2017_lorenzoalvarez_mbse_euclid.pdf|ESA Euclid - Case Study}} | Jose Lorenzo (European Space Agency) | | | 11:30-12:00 | {{:mbse:incose_mbse_iw_2017:1130_iw2017_lorenzoalvarez_mbse_euclid.pdf|ESA Euclid - Case Study}} | Jose Lorenzo (European Space Agency) | | ||
Line 77: | Line 77: | ||
| 16:00-16:30 | {{:mbse:incose_mbse_iw_2017:nist-incoseiw2017-sai-overview-3.pdf|An Overview of Systems Analysis Integration at NIST}} | Conrad Bock/Tim Sprock (NIST) & Leon McGinnis (Georgia Tech) | | | 16:00-16:30 | {{:mbse:incose_mbse_iw_2017:nist-incoseiw2017-sai-overview-3.pdf|An Overview of Systems Analysis Integration at NIST}} | Conrad Bock/Tim Sprock (NIST) & Leon McGinnis (Georgia Tech) | | ||
| 16:30-17:00 | {{http://wiki.omg.org/MBSE/doku.php?id=mbse:smswg:2017-01-30|NAFEMS-INCOSE Collaboration, Status, and Outcomes}} | Roger Burkhart (John Deere) | | | 16:30-17:00 | {{http://wiki.omg.org/MBSE/doku.php?id=mbse:smswg:2017-01-30|NAFEMS-INCOSE Collaboration, Status, and Outcomes}} | Roger Burkhart (John Deere) | | ||
- | | 17:00-17:30 | ASSESS Initiative Overview | Joe Walsh (intrinSIM) | | + | | 17:00-17:30 | {{:mbse:incose_mbse_iw_2017:assess_incose_1.pdf|ASSESS Initiative Overview}} | Joe Walsh (intrinSIM) | |
| 17:30-18:30 | MBSE Reception (Zen Garden) | | | 17:30-18:30 | MBSE Reception (Zen Garden) | | ||
Line 110: | Line 110: | ||
| 9:00-10:00 | SE Transformation Working Session | Troy Peterson (SSI) | | | 9:00-10:00 | SE Transformation Working Session | Troy Peterson (SSI) | | ||
| 10:30-12:00 | SE Transformation Working Session: Prepare for Outbrief | Troy Peterson (SSI) | | | 10:30-12:00 | SE Transformation Working Session: Prepare for Outbrief | Troy Peterson (SSI) | | ||
- | | 13:00-14:00 | MBSE Workshop Outbriefs | Troy Peterson (SSI) | | + | | 13:00-14:00 | MBSE Workshop Outbriefs and {{:mbse:incose_mbse_iw_2017:iw2017_transformation_closing_v1.pdf|SE Transformation Closing}} | Troy Peterson (SSI) | |
== Other groups with MBSE-related topics on Tuesday (see group section below for details) == | == Other groups with MBSE-related topics on Tuesday (see group section below for details) == | ||
Line 129: | Line 129: | ||
===== Decision Analysis Working Group ===== | ===== Decision Analysis Working Group ===== | ||
- | [[mbse:incose_mbse_iw_2017:dawg|Meeting Page for Decision Analysis WG at IW2017 (no INCOSE website yet)]] | + | [[mbse:incose_mbse_iw_2017:dawg|Meeting Page for Decision Analysis WG at IW2017]] |
===== DoD Digital Engineering / Digital System Model Workshop ===== | ===== DoD Digital Engineering / Digital System Model Workshop ===== |