This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
mbse:methodology [2013/05/29 17:43] jcwatson |
mbse:methodology [2015/07/30 12:25] jcwatson |
||
---|---|---|---|
Line 1: | Line 1: | ||
+ | [[http://www.omgwiki.org/MBSE/doku.php?id|Click Here]] to return to the main MBSE Wiki Page. | ||
+ | |||
====== Methodology and Metrics ====== | ====== Methodology and Metrics ====== | ||
Line 37: | Line 39: | ||
| Jeff A. Estefan | NASA/JPL | <[email protected]> | | | Jeff A. Estefan | NASA/JPL | <[email protected]> | | ||
| Michelle Sprecht | IBM | <[email protected]> | | | Michelle Sprecht | IBM | <[email protected]> | | ||
- | | John C Watson| Lockheed Martin | <[email protected]> | | + | | John C Watson (Lead)| Lockheed Martin | <[email protected]> | |
| J.D. Baker | No Magic | <[email protected]> | | | J.D. Baker | No Magic | <[email protected]> | | ||
Line 52: | Line 54: | ||
^Name^Primary Point of Contact^ | ^Name^Primary Point of Contact^ | ||
- | |**[[http://www.omgwiki.org/MBSE/doku.php?id=mbse:incoseoosem|INCOSE Object-Oriented Systems Engineering Method (OOSEM)]]**|<[email protected]>| | + | |**[[mbse:incoseoosem|INCOSE Object-Oriented Systems Engineering Method (OOSEM)]]**|<[email protected]>| |
- | |**[[http://www.omgwiki.org/MBSE/doku.php?id=mbse:harmonyse|IBM Rational Telelogic Harmony-SE]]**|<[email protected]>| | + | |**[[mbse:harmonyse|IBM Rational Telelogic Harmony-SE]]**|<[email protected]>| |
- | |**[[http://www.omgwiki.org/MBSE/doku.php?id=mbse:ibmrupse|IBM Rational Unified Process for Systems Engineering (RUP-SE)]]**|<[email protected]>| | + | |**[[mbse:ibmrupse|IBM Rational Unified Process for Systems Engineering (RUP-SE)]]**|<[email protected]>| |
- | |**[[http://www.omgwiki.org/MBSE/doku.php?id=mbse:vitechmbse|Vitech Model-Based Systems Engineering (MBSE) Methodology|Vitech]]**|<[email protected]>| | + | |**[[mbse:vitechmbse|Vitech Model-Based Systems Engineering (MBSE) Methodology|Vitech]]**|<[email protected]>| |
- | |**[[http://www.omgwiki.org/MBSE/doku.php?id=mbse:jplstateanalysismethodology|JPL State Analysis (SA) Methodology|JPL State Analysis (SA)]]**|<[email protected]>| | + | |**[[mbse:jplstateanalysismethodology|JPL State Analysis (SA) Methodology|JPL State Analysis (SA)]]**|<[email protected]>| |
- | |**[[http://www.omgwiki.org/MBSE/doku.php?id=mbse:doriObjMethodology|Dori Object-Process Methodology (OPM)]]**|<[email protected]>| | + | |**[[mbse:doriObjMethodology|Dori Object-Process Methodology (OPM)]]**|<[email protected]>| |
==== Additional Methodologies Identified as Gaps Since 2008 INCOSE Survey ==== | ==== Additional Methodologies Identified as Gaps Since 2008 INCOSE Survey ==== | ||
- | |**[[http://www.omgwiki.org/MBSE/doku.php?id=mbse:sysmod|Weilkiens Systems Modeling Process (SYSMOD)]]**|<[email protected]>| | + | ^Name^Primary Point of Contact^ |
- | |**[[http://www.omgwiki.org/MBSE/doku.php?id=mbse:ppooa|Fernandez Process Pipelines in OO Architectures (PPOOA)]]**|<[email protected]>| | + | |**[[mbse:sysmod|Weilkiens Systems Modeling Process (SYSMOD)]]**|<[email protected]>| |
- | |**[[http://www.omgwiki.org/MBSE/doku.php?id=mbse:stateAnalJPLXXX|An Ontology for State Analysis: | + | |**[[mbse::ppooa|Fernandez Process Pipelines in OO Architectures (PPOOA)]]**|<[email protected]>| |
+ | |**[[mbse:stateAnalJPLXXX|An Ontology for State Analysis: | ||
Formalizing the Mapping to SysML]]**|<[email protected]>| | Formalizing the Mapping to SysML]]**|<[email protected]>| | ||
|** {{:mbse:pearce_hause_iso-15288_oosem_and_model-based_submarine_design_sete_apcose_2012.pdf|ISO-15288, OOSEM and | |** {{:mbse:pearce_hause_iso-15288_oosem_and_model-based_submarine_design_sete_apcose_2012.pdf|ISO-15288, OOSEM and | ||
Model-Based Submarine Design}}**|<[email protected]>| | Model-Based Submarine Design}}**|<[email protected]>| | ||
- | |**[[http://www.omgwiki.org/MBSE/doku.php?id=mbse:alstomASAP|Alstom ASAP methodology]]**|<[email protected]>| | + | |**[[mbse:alstomASAP|Alstom ASAP methodology]]**|<[email protected].com>| |
+ | |**[[mbse:PBSE|Pattern-Based Systems Engineering (PBSE)]]**|<schindel@ictt.com>| | ||
Line 86: | Line 90: | ||
- | ====== Metrics ====== | + | |
+ | ====== MBSE Metrics ====== | ||
===== MBSE ROI Metric Papers Realized from Industry ===== | ===== MBSE ROI Metric Papers Realized from Industry ===== | ||
Line 100: | Line 105: | ||
If you know of any additional information available to share to the industry, please forward the reference to <[email protected]> and we will include it in the survey. | If you know of any additional information available to share to the industry, please forward the reference to <[email protected]> and we will include it in the survey. | ||
- | |||
- | |||
- | |||
- | ---- | ||
Line 134: | Line 135: | ||
* {{:mbse:incose_workshop_methodology_and_metrics_outbrief_january_2011.pdf|INCOSE Workshop Methodology and Metrics Outbrief, January 2011}} | * {{:mbse:incose_workshop_methodology_and_metrics_outbrief_january_2011.pdf|INCOSE Workshop Methodology and Metrics Outbrief, January 2011}} | ||
- | ==== Methodology and Metrics Reference Materials ==== | + | |
- | * Regina M. Gonzales, {{:mbse:completeness_indicators_incose_2001_p762_214.pdf| - Completeness of Conceptual Models Developed | + | |
- | using the ISCM Development Process}} | + | |
====== Reference Links ====== | ====== Reference Links ====== |